ISO stands for International standard organisationwhich is an non-governmental body. This body was developed in Switzerland in 1945, right after World War II. The reason behind the development of ISO is to create international standards for industrial and commercial products within a business. ISO is a network of the national standards institutes of 163 countries, one member per country, with a Central Secretariat in Geneva, Switzerland, that coordinates the system.

Standards ensure desirable characteristics of products and services such as quality, environmental friendliness, safety, reliability, efficiency and interchangeability – and at an economical cost. Receiving certification by the ISO means that a business has agreed to uphold certain standards and practices in its day-to-day operations. These standards are of particular importance when it comes to industries and commercial interests that may have a significant environmental impact through the discharge of waste of by-products. ISO standards are an internationally recognised set of benchmarks for any association that enable you to create as well as maintain a structured management system with a clearly defined set of processes.

ISO 9001 is known across the world as the standard for high quality business operations and management whereas ISO 14001 for environmental management. Both big and small companies prefer going by ISO 9001 and ISO 14001 standards because of its versatility and efficiency. Today, over 875,000 companies are ISO certified. The ISO 9001and 14001 standard is designed to be implemented in various business procedures necessary for the creation and quality control of a given product or service that a company offers. A solid monitoring and control system is incorporated, making sure that a company provides consistent, high-quality production outputs that always satisfy customer demands. ISO 9001and 14001 can be implemented in any process, regardless of the location of the company or department facility.

Having ISO 9001 Certification is an indication that a company or business firm is committed to providing customers with high quality products and services. It also shows that a company is willing to do what it takes to achieve better production efficiency. For environmental management system ISO 14001 helps you to identify the key impacts that you have on the environment, important legislation and then set about controlling as well as improving these impacts. These are the two traits all customers and organizations look for when choosing a company to do business with. An ISO 9001 certificate also shows that it has a solid and excellent Quality Management System that is capable of passing the rigors of independent and external auditing. By enhancing a company’s image in the customer’s eyes, an ISO 9001 certified business firm has a competitive advantage over other businesses in the same industry.

Read more on ISO 9001 Standards at http://www.iso9001store.com

Monday, May 16, 2011

The Audit Plan In ISO 14001

The audit plan is the document that establishes the scope, objectives and criteria, and schedule of the audit. It also goes into specific details on what areas will be audited, when, and by whom.
Other details such as which checklists may be used, how the report is to be formatted and distributed, and how meetings will be conducted can also be included in the plan. In essence, the audit plan reflects the programs, procedures, and methodologies of the EMS audit process, in accordance with element 4.5.4 of ISO 14001. These planning items are usually described in the procedures for element 4.5.4 and do not need to be re-created every time an audit occurs. For example, it can be determined that the entire EMS will be audited once per year, but in four partial events. This schedule then becomes part of the procedure.
The audit scope defines what part of the organization will be audited. Obviously, this should coincide with the scope of the EMS itself, and is usually the site in question. If the full EMS audit is divided in smaller segments conducted throughout the year, then the scope of any given segment is what portion of the organization will be audited at that time. Typically, an organization will create a chart or matrix showing the various divisions of the site or activity and when it will be audited. A typical entry may show the maintenance department being audited in the first quarter and production in the fourth quarter, for example.
Also noted in the audit plan is the audit objective(s). The audit objective describes why an audit is being conducted. Typically the reason is to conform to ISO 14001 4.5.4 requiring that the EMS be periodically evaluated. Another reason is demonstrate conformance to others.
Although EMS audits may appear in their own right to be “good practice”, it is essential that auditors have a clear concept of what the general objectives of such audits are.
The definition of EMS audits highlights the need to confirm conformance with planned arrangements and to ensure that these arrangements are effective and suitable to achieve objectives. ISO 14011 expands this to form a number of general objectives for any type of EMS audit. Audits should be carried out to:
- determine conformance of an auditee’s EMS with the EMS audit criteria
- determine whether the auditee’s EMS has been properly implemented and maintained
- to identify areas of potential improvement in the auditee’s EMS
- assess the ability of the internal management review process to ensure the continuing suitability and effectiveness of the EMS
- evaluate the EMS of an organization where there is a desire to establish a contractual relationship, such as with a potential supplier or a joint-venture partner.
Using this definition and sources such as ISO 14010 and 14011, the following statement of the specific objectives of an internal EMS audit has been developed. Internal audits should be carried out to ensure that:
- The EMS continues to meet the needs of the business
- The necessary documented procedures that exist are practical and satisfy any specified requirements
- The necessary documented procedures are understood and followed by appropriately trained personnel
- Areas of conformity and nonconformity with respect to implementation of the EMS system are identified and corrective action implemented
- The effectiveness of the system in meeting the EMS objectives is determined and that a basis is created for identifying opportunities and initiating actions to improve the EMS system
The above objectives imply that internal audits are concerned with more than just the policing of an established system. If auditors and managers are to remain committed to the implementation of the EMS system, it must also contribute to the process of developing that system and seeking improvements.
Internal auditing must not be carried out in a way that results in the transfer of responsibility from the operating staff to the auditor or auditing organization, i.e., at all times the individual or department must retain and accept responsibility for his or her role in the EMS.
If the internal audit process is not designed and implemented to meet the objectives and to avoid the pitfalls described above, it is unlikely that the top management commitment essential to an effective audit process will be readily forthcoming.
The audit criteria define what the “rules” are. For the sake of this guide, the criteria will be the elements of ISO 14001. A subtle point to note however is that the site’s EMS requirements are also part of the criteria. This means that in addition to responding to the requirements of ISO 14001, the EMS must also respond to “planned arrangements”, or what the organization said it was going to do. In audits, a common response is “the standard does not require such and such detail”. However, if the site’s procedure does require some specific response, then it becomes part of the criteria. In essence, the auditors are verifying the system not only to ISO 14001, but also to what the EMS documentation states.
How the audit is divided and scheduled throughout the time interval is up to the organization and will be a function of minimizing disruption to site operations and resource needs. The only requirement is that the full audit be completed within the frequency established in the procedures under 14001, 4.5.4. One of the requirements regarding frequency is that how often an area is audited be in part a function of prior audit results. This means that the planned frequency may change with time based on what auditors are finding.
How long each audit takes again is a function of resource needs and operations. It is recommended, however, that any individual audit event not be protracted out over long time periods. The longer a task takes, the easier it is to get distracted and lose focus.
Much has been written about how to audit a system if the full audit is not completed in one event. Unlike other audits, including quality audits, where a more segmented approach can be taken, ISO 14001 systems tend to be very sensitive to consistency. For example, the emergency planning process may conform to the standard element 4.4.7 in that a procedure exists; however,
it may not reflect the potential significant impacts identified in element 4.3.1. Had the audit team focused only on element 4.4.7, they would not have noted the apparent nonconformance.
When developing an audit plan, it is wise to consider the three C’s of ISO 14001 EMS auditing:
Conformance, Consistency, and Continual Improvement. Conformance relates to addressing each of the requirements of the standard, i.e., the “shalls”. Consistency relates to how well each procedure or process of the EMS relates to the others. In other words, do objectives and targets reflect the policy commitments? Are personnel trained on the correct legal and other requirements? Finally, Continual Improvement requires that the system lead to improvements in the system itself as well as with environmental performance. A system that has all the prerequisite procedures, but remains static, is not in conformance.
The concepts of consistency and continual improvement are more subtle because they are through-running threads of the standard and not always a definitive statement. The required commitment to continual improvement and the text of the standard itself however do go some way towards reminding the auditor.
With the three C’s in mind, one now sees why it is best to audit all applicable elements of the standard in a given area at one time, rather that tracing any one standard element throughout various areas. For example, during the first quarter audit event, Company X may audit all of ISO 14001 in maintenance. During the second quarter event, all of ISO 14001 will be audited in the production area, and so on. This is in contrast to auditing only a certain element, i.e., corrective action, across several site areas in one audit event.
Now we know what is being audited, when it is being audited, and to what “rules” it is being audited. The remainder of the plan is simply then the logistics of the audit. The logistics include identification of team members, noting if and what checklists will be used, schedule and formats of meeting to name a few. Below is the full list of recommended audit plan elements as described in ISO 14011:
• the audit objectives and scope;
• the audit criteria;
• identification of the auditee’s organizational and functional units to be audited;
• identification of the functions and/or individuals within the auditee’s organization having significant direct responsibilities regarding the auditee’s EMS;
• identification of those elements of the auditee’s EMS that are of high audit priority;
• the procedures for auditing the auditee’s EMS elements as appropriate for the auditee’s organization;
• the working and reporting languages of the audit;
• identification of reference documents;
• the expected time and duration for major audit activities;
• the dates and places where the audit is to be conducted;
• identification of audit team members;
• the schedule of meetings to be held with the auditee’s management;
• confidentiality requirements;
• report content and format, expected date of issue and distribution of the audit report;
• document retention requirements.
If the internal audit is to proceed smoothly, it is helpful for the internal auditor to establish a dialogue prior to the actual audit with the person responsible for the area being audited. This dialogue may be conducted by memo, telephone, or during a formal or informal meeting. The main factor that should influence the auditor’s choice of method for setting up this dialogue should be the organization’s normal style or culture. Irrespective of the method of communication the auditor adopts, the following points should be established:
• The overall duration of the proposed audit
• The starting location and time
• The proposed scope and areas to be covered by the audit
• A timetable for approximate progress of the audit where applicable, e.g., if a number of different departments or geographical areas are to be included in the scope of the audit
• The arrangements for any close out meeting where the findings of the audit can be agreed and corrective action requirements discussed
• The personnel liable to be involved at each stage of the audit
If an auditor does not give sufficient attention to ensuring that clear agreement is reached with respect to the above points, the potential for misunderstandings that can affect the conduct of the audit is greatly increased. However, these initial communications with the personnel of the area being audited not only affect the “tone” of the forthcoming audit, but they can significantly influence the commitment and level of cooperation shown by that area throughout the audit process and for many subsequent audits.
Prior to commencing the audit, but once the plan is prepared, the audit team assignments are made, and working documents are defined. Working documents are those documents such as observation logs and checklists that are used during the audit to collect evidence, but are not necessarily retained as records. In other words, they may be discarded after the audit is complete and the report prepared.
Of these, only the checklist should require an input at this stage from the auditor. However, before compiling a checklist, the auditor must determine if the function and format of the checklist are prescribed by the audit procedure or whether personal preference can be exercised.
The format of the checklist may vary considerably, depending on whether it is intended to act as an aide or as a part of audit records showing the scope and conduct of the audit. The former may consist only of general topics to be covered during the audit, whereas the latter may be an extensive and detailed questionnaire on which details of sampling and answers to the questions are to be recorded.
The need for checklists and the type appropriate will vary according to other experience of the auditors and the culture of the company. It is recommended that for purposes of internal audits, checklists, even if limited, should always be developed. However, standard questionnaire type checklists not prepared by the auditor that must be slavishly followed and completed, should be
avoided. This latter type is likely to result in an unnecessary restriction in the scope of the audit and a stifling of auditor initiative.
Although an auditor should always work within the scope defined for the audit, the working documents must not be designed so that they restrict additional audit activities or investigations that may become necessary as a result of information gained during the audit. There are differences of opinion over whether it is preferable to create the checklist anew or whether a previously developed checklist can be used. Although the former is desirable in principle, it is not always practical in terms of the best use of the resources available. The best compromise is to utilize whatever available checklists are already in existence, but to review these critically
against the relevant documents previously identified. In this way, time can be saved in using them as a foundation without detracting from effectiveness.

Tuesday, February 1, 2011

Introduction To ISO 14001 Standards

An environmental policy should reflect the vision, intentions, philosophy, values, and beliefs of the organization with respect to the environment. Top management should put a great deal of thought and imagination into developing and crafting the policy, since it will become the code of conduct by which the organization lives and operates. The policy should be practical and inspirational, providing a framework and a compass for business and technical decisions and actions, and at the same time motivate and encourage all personnel in the organization to achieve excellence in environmental performance.

The ISO 14001 Standard specifies several requirements for the development, content, intent, and implementation of an environmental policy:

1. Top management is responsible and accountable for defining the organization’s environmental policy. They must, as a minimum, carefully review, approve, and commit to abiding by an environmental policy that has been developed for their consideration.

2. The policy must completely cover the organization’s (i.e., facility’s) range of operations, including where appropriate, raw material acquisition, transportation, packaging, and shipping of product,as well as all on-site operations that may impact the environment.

3. The policy must contain three core commitments that are ISO 14001 absolute requirements:

(i) A commitment to continual improvement of the EMS and environmental performance.
(ii) A commitment to the prevention of pollution (i.e., this means taking all reasonable steps to eliminate, or at least minimize, pollution).
(iii) A commitment to comply with relevant environmental legislation and regulations, and with other requirements to which the organization subscribes. This means the organization commits to meet local, regional, and national legislated environmental standards.

4. The policy must give direction and a framework for progress through new environmental objectives and targets that will be set during the course of implementing and maintaining the EMS.

5. The policy must be documented, and it must be implemented through the day-to-day functioning of the EMS.

6. The policy must be maintained, meaning kept up to date and relevant to current operations and conditions.

7. The policy must be communicated to all employees. This implies active, intentional efforts by the organization, led by top management, to ensure all employees know about, understand, and apply the principles, ideas, and commitments in the policy.

8. The policy must be made available to the public, i.e., it must be accessible to all members of the public who wish to see it.

In addition to the essential requirements for an environmental policy, other considerations that may be incorporated into the policy include:

Principles of sustainable development, resource renewal, and preservation • of biological diversity

A commitment to use the most effective pollution abatement technology and • equipment, consistent with economic viability of the business (i.e., BEAT – Best Economically Achievable Technology)

Use of environmental performance indicators to quantitatively monitor • progress

Life cycle thinking – consideration of ‘cradle to grave’ impacts of a • product, which would require the organization to assess cumulative environmental impacts from all stages, from design of the product; acquisition of raw materials; processing to finished product; packaging; shipment; end-use; and ultimate re-use, recycle, or disposal.

For all components of this element of the Standard to be brought to fruition, it is essential that there is clear allocation of responsibilities for developing, approving, communicating, disseminating, implementing, maintaining, and when necessary, revising the environmental policy.

Although environmental policy is the first element of ISO 14001, it may be prudent for an organization to defer finalization of the wording of their policy until work has been done to identify the scope of environmental impacts from the operation, and other planning and preliminary preparation for the EMS has been done. This will help to ensure the policy is authentic and appropriate for the organization’s purpose.

Please visit http://www.e-wia.com for more information.

Thursday, November 11, 2010

The Audit Plan In ISO 14001

The Audit Plan In ISO 14001
The audit plan is the document that establishes the scope, objectives and criteria, and schedule of the audit. It also goes into specific details on what areas will be audited, when, and by whom.
Other details such as which checklists may be used, how the report is to be formatted and distributed, and how meetings will be conducted can also be included in the plan. In essence, the audit plan reflects the programs, procedures, and methodologies of the EMS audit process, in accordance with element 4.5.4 of ISO 14001. These planning items are usually described in the procedures for element 4.5.4 and do not need to be re-created every time an audit occurs. For example, it can be determined that the entire EMS will be audited once per year, but in four partial events. This schedule then becomes part of the procedure.
The audit scope defines what part of the organization will be audited. Obviously, this should coincide with the scope of the EMS itself, and is usually the site in question. If the full EMS audit is divided in smaller segments conducted throughout the year, then the scope of any given segment is what portion of the organization will be audited at that time. Typically, an organization will create a chart or matrix showing the various divisions of the site or activity and when it will be audited. A typical entry may show the maintenance department being audited in the first quarter and production in the fourth quarter, for example.
Also noted in the audit plan is the audit objective(s). The audit objective describes why an audit is being conducted. Typically the reason is to conform to ISO 14001 4.5.4 requiring that the EMS be periodically evaluated. Another reason is demonstrate conformance to others.
Although EMS audits may appear in their own right to be “good practice”, it is essential that auditors have a clear concept of what the general objectives of such audits are.
The definition of EMS audits highlights the need to confirm conformance with planned arrangements and to ensure that these arrangements are effective and suitable to achieve objectives. ISO 14011 expands this to form a number of general objectives for any type of EMS audit. Audits should be carried out to:
- determine conformance of an auditee’s EMS with the EMS audit criteria
- determine whether the auditee’s EMS has been properly implemented and maintained
- to identify areas of potential improvement in the auditee’s EMS
- assess the ability of the internal management review process to ensure the continuing suitability and effectiveness of the EMS
- evaluate the EMS of an organization where there is a desire to establish a contractual relationship, such as with a potential supplier or a joint-venture partner.
Using this definition and sources such as ISO 14010 and 14011, the following statement of the specific objectives of an internal EMS audit has been developed. Internal audits should be carried out to ensure that:
- The EMS continues to meet the needs of the business
- The necessary documented procedures that exist are practical and satisfy any specified requirements
- The necessary documented procedures are understood and followed by appropriately trained personnel
- Areas of conformity and nonconformity with respect to implementation of the EMS system are identified and corrective action implemented
- The effectiveness of the system in meeting the EMS objectives is determined and that a basis is created for identifying opportunities and initiating actions to improve the EMS system
The above objectives imply that internal audits are concerned with more than just the policing of an established system. If auditors and managers are to remain committed to the implementation of the EMS system, it must also contribute to the process of developing that system and seeking improvements.
Internal auditing must not be carried out in a way that results in the transfer of responsibility from the operating staff to the auditor or auditing organization, i.e., at all times the individual or department must retain and accept responsibility for his or her role in the EMS.
If the internal audit process is not designed and implemented to meet the objectives and to avoid the pitfalls described above, it is unlikely that the top management commitment essential to an effective audit process will be readily forthcoming.
The audit criteria define what the “rules” are. For the sake of this guide, the criteria will be the elements of ISO 14001. A subtle point to note however is that the site’s EMS requirements are also part of the criteria. This means that in addition to responding to the requirements of ISO 14001, the EMS must also respond to “planned arrangements”, or what the organization said it was going to do. In audits, a common response is “the standard does not require such and such detail”. However, if the site’s procedure does require some specific response, then it becomes part of the criteria. In essence, the auditors are verifying the system not only to ISO 14001, but also to what the EMS documentation states.
How the audit is divided and scheduled throughout the time interval is up to the organization and will be a function of minimizing disruption to site operations and resource needs. The only requirement is that the full audit be completed within the frequency established in the procedures under 14001, 4.5.4. One of the requirements regarding frequency is that how often an area is audited be in part a function of prior audit results. This means that the planned frequency may change with time based on what auditors are finding.
How long each audit takes again is a function of resource needs and operations. It is recommended, however, that any individual audit event not be protracted out over long time periods. The longer a task takes, the easier it is to get distracted and lose focus.
Much has been written about how to audit a system if the full audit is not completed in one event. Unlike other audits, including quality audits, where a more segmented approach can be taken, ISO 14001 systems tend to be very sensitive to consistency. For example, the emergency planning process may conform to the standard element 4.4.7 in that a procedure exists; however,
it may not reflect the potential significant impacts identified in element 4.3.1. Had the audit team focused only on element 4.4.7, they would not have noted the apparent nonconformance.
When developing an audit plan, it is wise to consider the three C’s of ISO 14001 EMS auditing:
Conformance, Consistency, and Continual Improvement. Conformance relates to addressing each of the requirements of the standard, i.e., the “shalls”. Consistency relates to how well each procedure or process of the EMS relates to the others. In other words, do objectives and targets reflect the policy commitments? Are personnel trained on the correct legal and other requirements? Finally, Continual Improvement requires that the system lead to improvements in the system itself as well as with environmental performance. A system that has all the prerequisite procedures, but remains static, is not in conformance.
The concepts of consistency and continual improvement are more subtle because they are through-running threads of the standard and not always a definitive statement. The required commitment to continual improvement and the text of the standard itself however do go some way towards reminding the auditor.
With the three C’s in mind, one now sees why it is best to audit all applicable elements of the standard in a given area at one time, rather that tracing any one standard element throughout various areas. For example, during the first quarter audit event, Company X may audit all of ISO 14001 in maintenance. During the second quarter event, all of ISO 14001 will be audited in the production area, and so on. This is in contrast to auditing only a certain element, i.e., corrective action, across several site areas in one audit event.
Now we know what is being audited, when it is being audited, and to what “rules” it is being audited. The remainder of the plan is simply then the logistics of the audit. The logistics include identification of team members, noting if and what checklists will be used, schedule and formats of meeting to name a few. Below is the full list of recommended audit plan elements as described in ISO 14011:
• the audit objectives and scope;
• the audit criteria;
• identification of the auditee’s organizational and functional units to be audited;
• identification of the functions and/or individuals within the auditee’s organization having significant direct responsibilities regarding the auditee’s EMS;
• identification of those elements of the auditee’s EMS that are of high audit priority;
• the procedures for auditing the auditee’s EMS elements as appropriate for the auditee’s organization;
• the working and reporting languages of the audit;
• identification of reference documents;
• the expected time and duration for major audit activities;
• the dates and places where the audit is to be conducted;
• identification of audit team members;
• the schedule of meetings to be held with the auditee’s management;
• confidentiality requirements;
• report content and format, expected date of issue and distribution of the audit report;
• document retention requirements.
If the internal audit is to proceed smoothly, it is helpful for the internal auditor to establish a dialogue prior to the actual audit with the person responsible for the area being audited. This dialogue may be conducted by memo, telephone, or during a formal or informal meeting. The main factor that should influence the auditor’s choice of method for setting up this dialogue should be the organization’s normal style or culture. Irrespective of the method of communication the auditor adopts, the following points should be established:
• The overall duration of the proposed audit
• The starting location and time
• The proposed scope and areas to be covered by the audit
• A timetable for approximate progress of the audit where applicable, e.g., if a number of different departments or geographical areas are to be included in the scope of the audit
• The arrangements for any close out meeting where the findings of the audit can be agreed and corrective action requirements discussed
• The personnel liable to be involved at each stage of the audit
If an auditor does not give sufficient attention to ensuring that clear agreement is reached with respect to the above points, the potential for misunderstandings that can affect the conduct of the audit is greatly increased. However, these initial communications with the personnel of the area being audited not only affect the “tone” of the forthcoming audit, but they can significantly influence the commitment and level of cooperation shown by that area throughout the audit process and for many subsequent audits.
Prior to commencing the audit, but once the plan is prepared, the audit team assignments are made, and working documents are defined. Working documents are those documents such as observation logs and checklists that are used during the audit to collect evidence, but are not necessarily retained as records. In other words, they may be discarded after the audit is complete and the report prepared.
Of these, only the checklist should require an input at this stage from the auditor. However, before compiling a checklist, the auditor must determine if the function and format of the checklist are prescribed by the audit procedure or whether personal preference can be exercised.
The format of the checklist may vary considerably, depending on whether it is intended to act as an aide or as a part of audit records showing the scope and conduct of the audit. The former may consist only of general topics to be covered during the audit, whereas the latter may be an extensive and detailed questionnaire on which details of sampling and answers to the questions are to be recorded.
The need for checklists and the type appropriate will vary according to other experience of the auditors and the culture of the company. It is recommended that for purposes of internal audits, checklists, even if limited, should always be developed. However, standard questionnaire type checklists not prepared by the auditor that must be slavishly followed and completed, should be
avoided. This latter type is likely to result in an unnecessary restriction in the scope of the audit and a stifling of auditor initiative.
Although an auditor should always work within the scope defined for the audit, the working documents must not be designed so that they restrict additional audit activities or investigations that may become necessary as a result of information gained during the audit. There are differences of opinion over whether it is preferable to create the checklist anew or whether a previously developed checklist can be used. Although the former is desirable in principle, it is not always practical in terms of the best use of the resources available. The best compromise is to utilize whatever available checklists are already in existence, but to review these critically
against the relevant documents previously identified. In this way, time can be saved in using them as a foundation without detracting from effectiveness.

The Audit Report In ISO 14001


Once agreement has been reached, both among the audit team and with the auditee, it is time to prepare the audit report. Note that ISO 14001 does not require a documented audit report. However, it is very difficult to verify that the auditing requirement has been satisfied without a supporting record, which is typically a documented audit report.
The audit report is prepared by the lead auditor, although he or she may have other team members prepare portions. The content of the audit report is determined by the audit plan and the organization’s EMS audit procedures. Having completed the examination phase and evaluated the collected data observations, etc., the assessor is faced with the problem of documenting any deficiencies he or she may have found. There are many different methods of documenting deficiencies, ranging from inclusion in the body of the audit report to producing non-conformance notes or corrective action requests. Irrespective of which method is adopted, the basic principles to be followed are similar. ISO 14001 does not dictate what should be in the report, and ISO 14011 only suggests contents. ISO 14011 indicates that at a minimum, the findings need to be in the report. The findings appear as a statement that the EMS is or is not in conformance with the criteria, and states what the criteria and supporting evidence are for the statement. ISO 14011 also lists other optional items to include such as:
• the identification of the organization audited and of the client;
• the agreed objectives, scope and plan of the audit;
• the agreed criteria, including a list of reference documents against which the audit was conducted;
• the period covered by the audit and the date(s) the audit was conducted;
• the identification of the auditee’s representatives participating in the audit;
• the identification of the audit team members;
• a statement of the confidential nature of the contents;
• the distribution list for the audit report;
• a summary of the audit process including any obstacles encountered;
• audit conclusions such as:
- EMS conformance to the EMS audit criteria;
- whether the system is properly implemented and maintained;
- whether the internal management review process is able to ensure the continuing suitability and effectiveness of the EMS.
The format of such reports can vary considerably and may range from completion of a simple pro-forma to expansive documents describing all aspects of the audit performance and findings. However, irrespective of the style and format, the audit report should cover the key topics already identified as being essential for discussion and presentation at the opening and closing meetings. In constructing the report two specific objectives must be borne in mind.
(1) The report has to provide objective evidence of effective implementation of the audit procedure.
(2) The report has to allow for corrective action to be addressed and that the follow-up requirements can be established and initiated.
Where there are non-conformances, there are various options regarding deficiency reporting. One option is to describe each of the deficiencies identified in the main body of the report along with any supporting evidence, and if requested, corresponding recommendations. Although this may result in a comprehensive report of audit findings, it has the disadvantage that the individual
deficiencies are often difficult to locate, particularly when trying to monitor follow-up actions.
This can be partly overcome by writing separate corrective action requests for this purpose. A useful alternative that is less time consuming is to restrict the description of deficiencies in the body of the report to general summaries only. Details of deficiencies can then be included in non-conformance notes. Ideally, the non-conformance note should also provide space for agreeing corrective actions and recording subsequent monitoring of that corrective action. In this manner, any duplication of effort with respect to audit reporting is minimized, thus producing a more easily managed system. It is important that however non-conformances are handled, it be constant with the EMS correction action process (ISO 14001, Section 4.5.2).
Before considering the steps in preparing the non-conformance note we must be clear about their purpose.
• To convey to the auditee the findings in a clear and accurate manner so that they know what to do next.
• To advise the EMS personnel or other auditors what you have found so that he can follow it up.
• To present a record that can be reviewed remotely from the scene and be understood.
All non-conformance notes must contain certain basic information.
• The physical area being audited.
- Failure to record this often results in great confusion 3 to 6 months later when a follow up visit is carried out to review corrective action implementation.
• The specific clause(s) of the assessment standard(s) against which the non-conformance is issued.
- If the auditor is unable to readily identify the applicable section of the EMS manual or the procedure against which to issue the non-conformance, he must question whether or not he is justified in writing the non-conformance. It is good practice to re-read the
requirements of the relevant system documentation to confirm that these can be interpreted as supporting the non-conformance. If they do not, then the non-conformance cannot be issued.
• The detailed nature of the non-conformance including the specific identity of documents/procedures/material, etc.
Earlier we considered the requirements for recording observations during the assessment and emphasized the need for them to be factual and to contain objective evidence that the system requirements were not being satisfied. Although this appears to be fairly straightforward, in practice this is often not the case. It is not unusual for inexperienced auditors to identify a deficiency only to fail to communicate the findings in a manner that facilitates implementation of the appropriate corrective action. The non-conformance note, while not being over long, must contain sufficient information to enable a person not present during the audit to be able to gauge the seriousness or otherwise of the observation.
The use of descriptive terms such as extensive, several, isolated, etc… is essential to communicate accurately the nature and extent of the deficiency, but care must be taken to ensure that their use does not result in a lack of objectivity; e.g., the term extensive can only be included if there is irrefutable evidence to justify its use. The auditor must also take care to ensure that the description is not only accurate but it is also fair, e.g., a statement that 50% of manifests were incorrectly signed may be accurate but is hardly fair if only two manifests were sampled.
Having documented the nature of the deficiency, some audit systems require the auditor to grade the deficiency or non-conformance, e.g., major and minor. It is not intended to discuss grading systems in detail since there are many potential variations that companies may wish to adopt. Irrespective of what system is being adopted, the auditor must ensure that the grading given and
the text describing the deficiency are completely compatible.
Distribution of the audit report and nature of documentation are decided between the auditor and auditee, although this too is usually addressed in the audit plan. An audit is considered successful when the auditee and client feel that they have useful, constructive feedback that allows them to improve the system.

Wednesday, July 14, 2010

Role of Governments In ISO 14001 Standards

Role of Governments In ISO 14001 Standards

Although ISO 14000 is a set of voluntary standards that individual companies may or may not choose to adopt, governments can clearly have a role in providing information, establishing the necessary framework and infrastructure, and, in some cases, helping companies to develop the basic capabilities to adopt ISO 14000. There are two particular areas in which government action would be useful: (a) providing information on the sectors and markets where ISO 14001 certification is a significant issue and assisting sector organizations to develop appropriate responses, and (b) helping to establish a certification framework, based on strengthening national standards organizations and encouraging competitive private sector provision of auditing and certification services. At present, the World Bank is having discussions with a number of countries about how assistance could be provided with these issues.

Governments should see EMS approaches as part of a broad environmental strategy that includes regulatory systems, appropriate financial incentives, and encouragement of improved industrial performance. Such encouragement can really only be effective where there is cooperation at the government level between the relevant departments, including industry and trade, as well as environment. There is a growing interest in integrating environmental management issues into productivity or competitiveness centers designed to promote SME performance, but little information exists on experience to date.

Environmental Policy In iSO 14001 Standard

Environmental Policy In ISO 14001 Standard

The company or organisation must write an environmental policy

statement which is relevant to the business activities and approved by

top management. Their full commitment is essential if environmental

management is to work. The ISO 14001 Standard clearly sets out

what to cover in the policy. Often a one page document is sufficient.

Produce a first issue and expect to amend it several times before

assessment and registration as knowledge grows in the company.